
Our team has nearly finalized our CAD and engineering drawings and are ready to start machining the parts of our machine. 14 out of 17 of our engineering drawings have been signed off, although our team may need to get several of the parts resigned because new holes are being added to attach our gears through a shaft with bearings. Nonetheless, our team will start using the laser cutter on Monday and hopefully finish machining 3 or 4 parts. Over this next week, our team hopes to not only complete MS7, but finish manufacturing most of the parts of our machine.
No comments:
Post a Comment